Mechanical Parts & Components — Pre-Shipment Inspection Report Template
The full checkpoint checklist for a pre-shipment inspection of machined and fabricated mechanical parts and components — dimensions and tolerances, material and finish, thread and fastener checks, functional fit and surface treatment — structured to ANSI/ASQ Z1.4 (ISO 2859-1) sampling, with AQL defect classification built in. Read the full checklist below, or download the editable Word version to use on your next shipment.
Get the editable template
The full report as a fillable Word document — sections, checkpoints, sampling tables and defect log ready to use. Free.
Word (.docx) · Free · No watermark
What this template covers
Every mechanical parts & components PSI report is graded across nine result criteria. The inspector records a result and note for each, and the overall lot is judged Pass / Pending / Fail against the AQL.
Sampling & AQL
The template samples to ANSI/ASQ Z1.4 (ISO 2859-1), with separate sample sizes for visual & workmanship, functional tests and special checks. Defects are recorded against the accept/reject numbers for your chosen AQL and inspection level. Need the numbers? Use the free AQL Sample Size Calculator.
Critical
May harm the user or breach mandatory regulations. Accept number is 0 — a single critical defect fails the lot.
Major
Reduces usability or salability; likely to cause customer returns. Judged against the major AQL (commonly 2.5).
Minor
A deviation unlikely to reduce usability or salability. Judged against the minor AQL (commonly 4.0).
The full inspection checklist
Every checkpoint the report walks through, in order. Each is scored at your chosen inspection level and recorded with photo evidence. Not every checkpoint applies to every product — delete any that don't fit yours when you edit the template.
Package & Packaging
Packing method and conditions / Retail package artworks / Correct content within the package / Quantity of items & accessories within the package / Presence of correct version of printed literature within the package
Conform with client specifications / Shipping marks / labels and their position
All the barcodes need to be clean / Barcode type as requested / Positions as per client requirements
Check individual poly bag/foam/blister protects part from scratches, corrosion, and transit damage
Verify carton board strength (burst/edge crush) suitable for part weight, proper taping/sealing pattern
Confirm VCI paper/oil coating/desiccant used for metal parts to prevent corrosion during transit
Style / Construction
Same style/materials with approved sample.
Same style/materials with technical file of the client.
Confirm material grade (metal alloy/plastic resin type) matches approved spec/drawing via visual/material cert
Check part construction, fitment features, mounting points match approved engineering drawing/CAD
Verify plating (zinc, chrome, powder coat) type and thickness matches spec using coating thickness gauge
Inspect welds, rivets, or bonded joints for completeness, no cracks or cold joints
Check threaded features with go/no-go gauges per the drawing callout (e.g. M6×1). / The go gauge must engage fully; the no-go gauge must not exceed the allowed turns.
Logo, Labelling & Markings
Logo quality, colors, dimensions, positioning, and alignment must conform with client specifications.
Correct content within the label & marking.
All the barcodes need to be clean. / Barcode type as requested. / Positions as per client requirements.
Verify part number/OEM code laser-etched or molded correctly, legible and matches drawing
Confirm required safety/warning labels (e.g., torque spec, orientation arrows) present, correct text and placement
Accessories
Accessories (if any) / Instruction Literature (if any)
Verify bolts, clips, gaskets, seals, and brackets included per BOM, correct quantity and type
Confirm instruction sheet/manual included, correct language and matches part revision
Functional & Performance
Weight shall match the product specification / approved sample. / Unless otherwise specified, tolerance ±5 %.
One column of export carton will be piled up to a height of 2.5m or as intended to be palletized for four hours. After the test, the bottom carton must show no compression that would affect the carton's shape and no damage to the product inside.
Height and drop sequence according to ISTA 1A procedure. Freefall on hard floor on one corner, three (3) edges, six (6) faces from ..... cm.
Operate each function as intended for use / The product needs to function in compliance with the information provided.
Operate functional and adjustable parts (if applicable), 20 times. Functions shall respond properly; no damages or blocked function shall occur.
Apply 3M-type tape over the printing/screening and pull off at a 45° angle. / Markings must remain clearly legible; adhesive labels must not work loose or curl at the edges.
All the barcodes need to be clean and readable with a barcode reader and the reading must correspond to client's information and printed numbers / characters. / Barcode type as requested. / Positions as per client requirements
Conduct salt spray (fog) test per ASTM B117 / ISO 9227 for specified hours (e.g., 48-96h) to verify corrosion resistance; no red rust or blistering
Mount part on jig/mating component to confirm proper fit, alignment, and function (e.g., valve opens/closes, bracket aligns)
Apply torque or pull force to fasteners/joints to verify holds spec load without failure
For fluid-carrying parts (hoses, seals), pressure test to verify no leakage at rated pressure
Subject sample to thermal cycling per spec to verify no cracking, warping, or performance degradation
Other (Client) Specifications / Requirements
Workmanship
Product physical conditions, appearance & cleanliness
Inspect for burrs, flash, sharp edges, scratches, dents, or discoloration on visible/functional surfaces
Check for any pre-existing rust, oxidation, or corrosion spots on metal components prior to shipment
Verify molded/machined parts free of flash, burrs, or sharp edges that could injure or affect assembly
Inspection conditions & site observations
A complete report also records the conditions under which the inspection was carried out — because a clean checklist means little if the sampling wasn't trustworthy:
How to use this template
Set your AQL and inspection level, then fill the report as you inspect. The defect log tallies critical / major / minor against the accept/reject numbers so the Pass / Pending / Fail decision is objective. Attach photos to each section.
Download the editable template
The full report as a fillable Word document — sections, checkpoints, sampling tables and defect log ready to use. Free.
Word (.docx) · Free · No watermark
Get new inspection templates first
Follow InspectionService.com on LinkedIn for new templates, checklists and QC tips.